Building and Planning

The new Free School will be a 5-19, co-educational special school with 246 places for children and young people who have additional and complex learning needs in the Sutton, South London and South East region. This school will replace the current school, but the  Carew Academy name will be maintained. 

Planning Consultation

A site at Sheen Way has been allocated in the Sutton Local Plan (2018) for a Special Education Needs School for children with autistic spectrum disorder and/or moderate learning difficulties.

A planning application, on behalf of the Department for Education, was submitted to the London Borough of Sutton in Summer 2019. Further details about the proposed building will be available on the planning portal of Sutton Council’s website.

A drop in exhibition at The Cricket Centre, Plough Lane, took place on 25 April 2019 between 4.00pm and 8.00pm. Please see below images and information presented at the event.

Planning Consultation leaflet

Introduction (design development, proposed site zoning, existing and proposed school site locations and aerial view of proposed site)

Site Plan and Landscape Proposals

Plan of Proposed Building

Images of Proposed Building

3D Views and Materials Pallete

Construction Phase

School Operational Phase

Planning Update – May 2021

A Public Enquiry on the new special Free School for Sutton was held by an Independent Planning Inspector between 29 September 2020 and 7 October 2020. The Inspector issued her report to the Secretary of State on 5 February 2021.

On 10 May 2021 the Secretary of State stated that planning permission should be granted for the new special Free School in Sutton. There is now a six-week Judicial Review which will finish on 22 June 2021.

Planning Update – June 2021

The six-week Judicial Review finished on 22 June 2021, it concluded no valid challenges. Construction is due to commence in the autumn term.

Planning Update – November 2021

We continue to work collaboratively with the Local Planning Authorities in support of discharging the Planning Conditions. For latest information, please continue to check this webpage.

New Activity

On Tuesday 24 November 2021 there will be a small survey team comprising of two engineers using surveying equipment to undertake non-intrusive ground surveys along the Capel Avenue Road, in support of our ongoing discussions with the Local Planning and Highways team who are aware of this survey work.

The survey will be completed within the day and residents may also see a support vehicle which is needed as part of the surveying activity.

Carew is an amazing school for our son, he now shines academically and his social skills are outstanding since being part of Carew.  Most of all they understand his needs and support him daily.

Parent Feedback

 

Latest News

Merit Reward Trip

Four wonderful students from Colombo went on their Merit Reward Trip to Bockett’s Farm. The bumpy tractor ride around the farm was a brilliant way to see and learn about some of the animals including Alpacas, Shetland Pony’s, Sheep, Cows …

Read more

Happy Windrush Day

Windrush Day marks the arrival of Caribbean immigrants to the shores of Britain on 22 June each year – the day HMT Empire Windrush arrived at Tilbury Docks in 1948. Carew Staff were treated by the EDI group with snacks …

Read more

Tennis Festival

On Friday 17th of June, nine of our lower school students attended the ‘Sutton Schools Lower School Tennis Festival’ at Cheam LTC. The students participated in a variety of fun tennis activities and had the chance to compete against other …

Read more

Victorian Day

The Carew Academy Victorian Day was held on Friday 10th June.  Staff and pupils dressed up as Victorians – a wide variety of chimney sweeps, orphans, Victorian teachers and maids.  Some classes were able to take part in workshops where …

Read more